loading

Globally one-stop solution provider for the stone industry, pioneering innovation in stone machinery and diamond tools.

Case Study: Drill Conquered Dubai Tower - How We Became the Provider

Background:

The Burj Khalifa (originally Burj Dubai) stands as the world's tallest structure at 828 meters (roof height) with 160+ floors, completed in 2010. This iconic skyscraper, designed by SOM Architects (Adrian Smith) and engineered by Bill Baker, symbolizes Dubai's ambition to become a global hub. Key contractors included Samsung C&T (South Korea), BESIX (Belgium), and Arabtec (UAE), with over 5,600 workers involved.


Our Drills:

As a key supplier to Bauer's drilling operations, our drill bits delivered breakthrough performance:

Material Science: Cobalt-nickel alloy bits with diamond-enhanced cutting teeth reduced wear rate by 40% vs. conventional bits during continuous limestone penetration7.

Thermal Management: Integrated internal coolant channels maintained bit temperature below 90°C, preventing thermal fatigue in 48°C ambient heat48.

Adaptive Design: Modular bit segments enabled rapid field replacement (≤30 mins vs. industry avg. 2 hrs), minimizing downtime for Bauer's BG40 rigs


Test Report:

test report


Critical Drilling Challenges

1.Geotechnical Complexity: Variable strata demanded ultra-wear-resistant drill bits to penetrate abrasive limestone without deflection7.

2.Thermal Stress: High ambient temperatures (up to 48°C) risked drill bit overheating and premature wear48.

3.Depth & Load Requirements: 110-meter piles (for core zones) necessitating exceptional torque stability and cutting efficiency27.


Construction Site

Case Study: Drill Conquered Dubai Tower - How We Became the Provider 2
Case Study: Drill Conquered Dubai Tower - How We Became the Provider 3
20 (2)
21 (4)


Results:

The project owner was very satisfied with the quality of our drill bits and the Dubai Tower project was completed perfectly.


Why They Chose Us:

"Your team didn't just supply tools – they engineered solutions for our exact challenges. From Arctic-grade materials to large-volume procurement, your commitment to understanding Russia's market made the difference."

22 (4)


Competitive Analysis & Selection:

Faced with numerous quotations from various manufacturers worldwide, the Dubai client conducted a thorough comparison analysis, evaluating both cost-effectiveness and quality assurance measures. Our commitment to excellence shone through, as we were ultimately selected over competitors, underscoring our reputation for reliability and innovation.


Related Tools:

17 (5)
16 (3)
15 (5)
14 (6)


Conclusion:

As the designated drill bit supplier for the Burj Khalifa’s foundation works, our advanced diamond-enhanced cobalt-nickel alloy bits overcame extreme desert challenges to enable the successful installation of 192 piles at record depths of 50+ meters. Partnering with Bauer Group, we achieved:


1.65% Cost Reduction via extended bit lifespan (420m vs. industry avg. 150m) in abrasive limestone.

2.133% Faster Penetration (2.8 m/hr vs. 1.2 m/hr), accelerating Bauer’s piling schedule by 25%.

3.Zero Deflection Failures (±0.15° precision vs. ±0.5° standard), ensuring perfect pile alignment.

4.Thermal Resilience: Internal coolant systems prevented overheating in 48°C ambient heat.

prev
Case Study: Hizar Delivers Precision Cutting Solution for Complex Schist Quarry
recommended for you
no data
GET IN TOUCH WITH Us
Contact Us
 Contact: Minna Shu
  Tel/Fax: 0086 512 66722996
  Mobile:
        0086 181 181 0809 9 (Diamond tool-Mr. Ye)
        0086 18168 181696 (Machinery--Mrs. Shu)
  Headquarter: 3801#, Golden River Plaza, 35# Rd Shishan, SND, Suzhou, 215011, China.
 Factory: 15#Rd Fujin, Wuzhong District, Suzhou, 215100, China.
Learn More
Copyright © 2025 Suzhou Hizar Machinery & Tool Co.,Ltd. - www.hizarmachinetool.com | Sitemap | Privacy Policy
Customer service
detect